Asia Technology & Engineering Pte Ltd

Author name: AteAdmin

Uncategorized

See Us at OSEA2016 in Singapore at Marina Bay Sands

See Us at OSEA2016 in Singapore at Marina Bay Sands SINGAPORE – ATE will be attending OSEA2016 in Singapore at Marina Bay Sands. Welcome to visit us at Booth No. BN4-10, BN6-01 and BN6-02 during 29 November to 2 December 2016 (11am – 6pm daily). Please do feel free to meet and speak with our experts from ARCA Control Valves (www.arca-valve.com), ARJAY Oil-In-Water Instruments (www.arjayeng.com), FPI Process Laser Analyzers (www.fpi-inc.com) and SYSTEA Water Analyzer (www.systea.it) for any of your potential needs. 

Uncategorized

ATE Singapore Moved to 7 Gul Link Singapore 629377

SINGAPORE – With effect from 31 March 2015, ATE Singapore office and factory are relocated at “7 Gul Link Singapore 629377”. Both our telephone and facsimile numbers remain the same (tel 6565 7707 and fax 6565 7717).  Our new operations can be easily accessed from Tuas Road & Gul Circle via AYE or PIE. Gul Circle MRT Station (EW30) within walking distance is scheduled to open in June 2016. We highly appreciate the continuous supports from our valued clients, partners and suppliers, and look forward to further expanding our business with various parties in the near future.

Uncategorized

New Place, New Models, New Height.

SINGAPORE – ATE Singapore (ATESG) successfully possessed a new factory (gross floor area up to 20,000 square foot) at 7 Gul Link Singapore 629377, which can be easily accessed from Tuas Road & Gul Circle via AYE or PIE. Gul Circle MRT Station (EW30) within walking distance is scheduled to open in June 2016. ATE Singapore Operations will be moved to 7 Gul Link by April 2015. At New Place with New Models, ATE is aspiring to achieve a New Height!  

Uncategorized

ATE Awarded Design and Supply of Analyzer House Safety Systems to EMERSON

SINGAPORE – ATE, a specialist company for process & environmental instrumentation and analytical systems integration in Asia, is honored by EMERSON ROSEMOUNT ANALYTICAL for design and supply of six (6) sets of explosion-proof analyzer house safety systems which are all based on Allen-Bradley Programmable Logic Controllers for Gladstone Liquefied Natural Gas (GLNG) Project in Australia. GLNG Project is a pioneering initiative to convert coal seam natural gas to liquefied natural gas (LNG) for export to global markets. It represents a major investment in a cleaner energy source and fuel for the future. Based in Queensland Australia, the GLNG Project involves developing gas fields from the Bowen and Surat Basins in South-Western Queensland, and will transport the gas via a 420 kilometre underground pipeline to a LNG plant on Curtis Island, off the coastline of Gladstone. This groundbreaking US$16 billion Project is a joint venture between Santos and three of the world’s largest LNG companies, PETRONAS, TOTAL and KOGAS. GLNG is an integrated development that includes gas production and processing facilities in the Southern Highlands and Western Provinces of Papua New Guinea, including liquefaction and storage facilities with capacity of 6.6 million tons per year. There are over 700 kilometers of pipelines connecting the facilities.

error: Content is protected !!